Services

A fixed-scope reliability assessment for your plant

Downtime you can see coming is downtime you can plan around. A written top-10 risk list, with cost ranges, and a summary leadership can use.

A fixed-scope reliability assessment is for plant and maintenance leaders who can see the downtime but do not yet have a ranked view of which risks deserve the next dollar. It is two to three days on-site, a written top-10 risk list with cost ranges, and a summary you can take into a leadership meeting. The scope and fee are agreed in writing before anyone travels.

What the days are for

The visit is spent on a walkdown of agreed critical assets, a review of failure and PM history, and structured conversations with the people who run and maintain the plant. Findings are ranked by estimated consequence and frequency — as ranges, with assumptions stated — not as a false-precision single number. Illustrative excerpts of the format are on the sample deliverables page; those figures are generic example data, not client results.

What you leave with

  • A prioritized top-10 risk list with cost ranges
  • A leadership-ready summary of what to do first and why
  • Notes on where a deeper RCM, FMEA, RCA, or PdM design would be the logical next step

If you already know the system and need a finance-ready memo, see the reliability business case. If you want to test the math first, use the free calculator.

Scope2–3 days on-site, fixed
OutputTop-10 risk list, with cost ranges
FormatWritten findings, leadership-ready
PriceFrom $6,000, plus travel at cost
How it works

Scoped per job. No retainers, no mystery.

  1. A conversation, freeYou describe the asset, the pain, and what “fixed” looks like. You get an honest answer on whether the work is a fit and what it takes.
  2. A scoped proposalDeliverables, timeline, and price in writing before anything starts. You approve the scope, not a blank check.
  3. The work, with your teamSessions and analysis done alongside your people, so the method stays in the building when the engagement ends.
  4. Deliverables you can act onA task list, a business case, or an investigation report — in your format, ready to use.
Purchasing

Work can be purchased by purchase order or invoice. A W-9 is available on request. Use the PO / invoice form, or email inquiry@apexreng.com.

Client confidentiality

Everything you share stays yours. Plant data, failure history, drawings, and production numbers are never disclosed without your express written permission.

FAQ

Questions that usually come up

What is the fee?

A Reliability Assessment starts from $6,000 plus travel at cost, for a fixed 2–3 day on-site scope agreed in writing. If the plant or the asset list needs more time, that is priced before the work expands.

What do you need before the visit?

A critical-asset list if you have one, recent downtime or work-order history, and access to the people who know the plant. We will tell you what is missing rather than invent a picture from a thin file.

Is this a full RCM analysis?

No. The assessment is a prioritized look at risk and a leadership-ready summary of where to start. A full RCM or FMEA on a selected system can follow, as a separate scoped engagement.

Ready when you are

Describe the problem. Get a scoped proposal.

Request an Assessment
Request an Assessment