GET A FREE CONSULT

Apex reference orientation · Pumps

Build a pump maintenance plan around condition

Use the DOE maintenance overview to connect routine pump care with condition trends and periodic performance checks.

When this reference is useful

Pumping Systems Tip Sheet #5 distinguishes preventive work, condition monitoring and periodic efficiency testing. It discusses seals, bearings, alignment and motor condition as parts of a pumping-system maintenance program.

Original Apex application notes

Frame the investigation

  1. Start with the pump's function, duty and consequence of failure. Identify which checks already have a work order, owner and usable history.
  2. Compare vibration, temperature, leakage and performance records at comparable operating conditions. Record the load and measurement location with each observation.
  3. Use the pump, seal and bearing manufacturers' instructions to define tasks and limits. Turn an adverse trend into a reviewed follow-up work order.

Check these limits before applying it

  • The document is a 2005 overview. Its example leakage ranges and technology descriptions are not acceptance criteria for your pump.
  • Packed glands and mechanical seals have different leakage expectations. Use the actual seal arrangement and OEM requirements.
  • Electrical testing, alignment, adjustments and intrusive inspection require qualified personnel and the applicable isolation procedure.

Read the original source

Maintain Pumping Systems Effectively, U.S. Department of Energy, September 2005.

Read the DOE PDF (2 pages)

Free publisher-hosted PDF, about 228 KB. No email required.

Source text and publisher link checked 2026-11-18. This review establishes the document's identity and scope, not current OEM approval or independent technical validation. The Apex notes above are separate from the publisher's guidance.

This orientation supports investigation planning. Use the current equipment instructions and an equipment-specific work procedure before testing, changing settings or modifying a system. Do not bypass protective functions.

Turn what you have read into a useful next step.

Organize your equipment problem into a free preliminary engineering brief. No email required; you choose whether to share it for review.