Actual investigation — sanitized
VFD bearing investigation · CS-01

All four drive-end bearings examined showed fluting. Shaft-voltage measurements on suspect motors were 21–34 V peak-to-peak. The report separates confirmed physical evidence from supported explanations and recommended changes.
Findings and recommendations, not achieved savings.
Sample deliverable — fictional data
Gearbox RCA sample · RCA-2026-014

The sample traces water and cleaning-solution ingress during sanitation through an evidence register and logic tree. Its proposed package combines equipment changes, a critical spare and procedure changes.
Sample deliverable — fictional data
Reliability ROI sample · ROI-2026-005

The sample distinguishes the value of optimized maintenance from the incremental value of monitoring. Monitoring loses to maintenance alone in the conservative case; a pre-agreed trigger governs a later replacement decision.
Sample deliverable — fictional data
FMEA/FMECA sample · FMECA-2026-007

The sample covers 29 failure modes across 10 subsystems. Its task package connects each proposed maintenance or design action to a failure mode, a consequence and a verification step.
Sample deliverable — fictional data
Program assessment sample · PA-2027-001

The sample scores ten program elements using graded evidence and releases funding through explicit review gates rather than treating the whole roadmap as an unconditional investment.
Sample deliverable — fictional data
Asset criticality sample · CA-2026-003

The sample connects ranked asset tiers to proposals for reallocating PM hours and spares, with a review gate for checking the assumptions before changes are adopted.
Sample deliverable — fictional data
Maintainability sample · MA-2026-006

The sample identifies a planned seal change that exceeds the sanitation window assumed in the related ROI case. It funds one improvement package and defers three other levers at the sample's lower failure rates.
Sample deliverable — fictional data
Procurement recommendation sample · PR-2026-008

The sample shows why a lower purchase price cannot compensate for failing a mandatory requirement. Acceptance tests and contract terms make the proposed award's conditions explicit.