PdM

The P-F interval: what it is and how to use it

The P-F interval is the time, running hours, or cycles between a detectable potential failure (P) and the functional failure (F) you are trying to avoid. An on-condition or predictive task has to be done on an interval shorter than the P-F interval you believe you have — with enough margin that you can still act — or the warning will arrive between inspections, or too late to use.

Two common mistakes: treating a vendor’s “typical” P-F interval as a measurement of your machine, and setting a route frequency from technician availability rather than from the failure mode. If you do not know the interval, say so, use a conservative assumption, and look for data (history of detected defects, known degradation rates, or a trial period with a tighter route) rather than inventing precision.

Not every failure has a useful P. Some modes go from healthy to failed with little warning. Those modes need a different task type, a redesign, or a run-to-failure decision, not a tighter vibration route. That is the same task-selection logic you will meet in RCM and in PdM program design.

Related reading

Ready when you are

Put the idea to work on your plant.

See services
Request an Assessment